ORDER made by the Public Utilities Commission (hereinafter referred to as “the Commission”) in exercise of the powers conferred upon it by Sections 3, 6, 7, 21, 22, 23 and 24 of the Belize Telecommunications Act, No. 16 of 2002, Sections 32 and 48 of the Public Utilities Commission Act, Chapter 223 of the Laws of Belize, and all other powers thereunto the Commission enabling.
Interconnection and Infrastructure Order, 2010 – Final Unsigned Amended
Previous Post
2010 – Schedule 3: Interconnection & Infrastructure Rates Regulations (Amended)
Next Post
2010 – Schedule 2: Infrastructure Sharing Regulations
Recent Publication
- Belize Water Services Limited – Application for Telecommunicaitions Licence
- REQUEST FOR EXPRESSIONS OF INTEREST: CONSULTANCY FOR THE DEVELOPMENT OF A SOLAR PHOTOVOLTAIC PROJECT IN BELIZE
- Form 3 Major Generation and Network Application Form
- Form 2 Intermediate Distributed Generation Application Form
- Form 1 Minor Distributed Generation Application
- PUBLIC NOTICE: PUC Proposes to Grant Electricity Licence for Various Categories
- Terms and Condition of Licence to all Person of Various Categories
- Electrical Design Submission Guidelines






Electricity
Electricity
Water Sector
Telecom
Electricity
Water Sector