ORDER made by the Public Utilities Commission (hereinafter referred to as “the Commission”) in exercise of the powers conferred upon it by Sections 3, 6, 7, 21, 22, 23 and 24 of the Belize Telecommunications Act, No. 16 of 2002, Sections 32 and 48 of the Public Utilities Commission Act, Chapter 223 of the Laws of Belize, and all other powers thereunto the Commission enabling.
Interconnection and Infrastructure Order, 2010 – Final Unsigned Amended
Previous Post
2010 – Schedule 3: Interconnection & Infrastructure Rates Regulations (Amended)
Next Post
2010 – Schedule 2: Infrastructure Sharing Regulations
Recent Publication
- PUC Invites Comments on BEL’s Report: Implementation of the Regulatory Sandbox for Demand Charge Rate in Belize
- BEL Report 1: Implementation of the Regulatory Sandbox for Demand Charge Rate in Belize Compilation
- PUBLIC NOTICE: PUC Propose to Grant an Individual Licence to Belize Telemedia Limited
- PUBLIC NOTICE: PUC Proposes to Grant Consent to BELCOGEN
- What do you think about Voicemail?
- BEL Provides Notice to PUC that there will be a Material Shortfall in Generation Services in 2025
- Belize Telemedia Limited – Individual & Class Licence Application
- PUBLIC NOTICE: PUC Proposes to Grant Licence to BELCOGEN
Electricity
Electricity
Water Sector
Telecom
Electricity
Water Sector